CITY TRIBUNE
‘Accident waiting to happen’ at University Hospital Galway
From this week’s Galway City Tribune – Medical units within University Hospital Galway (UHG) were identified as potential accidents waiting to happen – after an independent inspection found half a dozen emergency exits were blocked by trolleys, chairs and equipment.
An inspection report by the Health and Safety Authority – released to the Galway City Tribune under Freedom of Information (FOI) – warned the West’s largest hospital of a series of breaches of law, including at its temporary Emergency Department.
As well as blocked emergency exits, the HSA highlighted problems with the advice given to staff about the use of PPE (Personal Protective Equipment) to guard against biological hazards, such as Covid-19.
The HSA warned UHG that there was ‘no ventilation’ in the Covid-positive (red stream) Emergency Department waiting room and criticised UHG for its signage, which was inadequate and could “lead to inadvertent exposure to a hazard or biological agent”.
UHG management said it had taken steps to address overcrowding problems of blocked emergency exits but conceded it was “challenging to ensure that compliance is adhered to at all times”.
The HSA wrote to UHG last November, following an inspection of the unit on October 21, and outlined a series of breaches of health and safety legislation.
In correspondence released to the Tribune, the HSA indicated that the HSE Fire Prevention Officer had made UHG aware of its concerns on fire safety as far back as August 2021, but the issues highlighted ‘were not fully addressed’ by the time of the HSA inspection in October.
In an improvement notice issued to UHG, HSA inspector Paul Pearson said he observed a number of emergency exit routes and exits obstructed.
He found the emergency exit door in the Paediatric Emergency Department was obstructed; he found extra trolleys obstructed the main exit route in the Acute Surgical Assessment Unit, which was being used as a non-Covid Emergency Department; the emergency exit of the Acute Surgical Assessment Unit was obstructed; the emergency exit and route on the corridor was obstructed outside the short-stay ward and Acute Medical Assessment Unit; two additional exit routes at the Acute Medical Assessment Unit were “obstructed by additional seating and equipment”.
The improvement notice warned UHG to “ensure emergency routes to emergency exits are kept clear at all times”.
In an official response, Chris Kane, General Manager of UHG, listed actions taken by the hospital to improve the dangerous situation highlighted by HSA.
But she conceded that use of trolleys has become part of daily life in the Acute Surgical Assessment Unit, which was operating as a Green or non-Covid Emergency Department.
This is a shortened preview version of this article. To read the rest of the report and the HSE’s response, see the May 13 edition of the Galway City Tribune. You can buy a digital edition HERE.
CITY TRIBUNE
Galway ‘masterplan’ needed to tackle housing and transport crises
From the Galway City Tribune – An impassioned plea for a ‘masterplan’ that would guide Galway City into the future has been made in the Dáil. Galway West TD Catherine Connolly stated this week that there needed to be an all-inclusive approach with “vision and leadership” in order to build a sustainable city.
Deputy Connolly spoke at length at the crisis surrounding traffic and housing in Galway city and said that not all of the blame could be laid at the door of the local authority.
She said that her preference would be the provision of light rail as the main form of public transport, but that this would have to be driven by the government.
“I sat on the local council for 17 years and despaired at all of the solutions going down one road, metaphorically and literally. In 2005 we put Park & Ride into the development plan, but that has not been rolled out. A 2016 transport strategy was outdated at the time and still has not been updated.
“Due to the housing crisis in the city, a task force was set up in 2019. Not a single report or analysis has been published on the cause of the crisis,” added Deputy Connolly.
She then referred to a report from the Land Development Agency (LDA) that identified lands suitable for the provision of housing. But she said that two-thirds of these had significant problems and a large portion was in Merlin Park University Hospital which, she said, would never have housing built on it.
In response, Minister Simon Harris spoke of the continuing job investment in the city and also in higher education, which is his portfolio.
But turning his attention to traffic congestion, he accepted that there were “real issues” when it came to transport, mobility and accessibility around Galway.
“We share the view that we need a Park & Ride facility and I understand there are also Bus Connects plans.
“I also suggest that the City Council reflect on her comments. I am proud to be in a Government that is providing unparalleled levels of investment to local authorities and unparalleled opportunities for local authorities to draw down,” he said.
Then Minister Harris referred to the controversial Galway City Outer Ring Road which he said was “struck down by An Bord Pleanála”, despite a lot of energy having been put into that project.
However, Deputy Connolly picked up on this and pointed out that An Bord Pleanála did not say ‘No’ to the ring road.
“The High Court said ‘No’ to the ring road because An Bord Pleanála acknowledged it failed utterly to consider climate change and our climate change obligations.
“That tells us something about An Bord Pleanála and the management that submitted such a plan.”
In the end, Minister Harris agreed that there needed to be a masterplan for Galway City.
“I suggest it is for the local authority to come up with a vision and then work with the Government to try to fund and implement that.”
CITY TRIBUNE
Official opening of Galway’s new pedestrian and cycle bridge
The new Salmon Weir pedestrian and cycle bridge will be officially opened to the public next Friday, May 26.
Work on the €10 million bridge got underway in April 2022, before the main structure was hoisted into place in early December.
A lunchtime tape-cutting ceremony will take place on Friday, as the first pedestrians and cyclists traverse the as-yet-unnamed bridge.
The Chief Executive of Galway City Council, Brendan McGrath, previously said the bridge, once opened, would remove existing conflicts between pedestrians, cyclists and traffic “as well as facilitating the Cross-City Link public transport corridor over the existing 200-year-old bridge”.
The naming of the new bridge has been under discussion by the Council’s Civic Commemorations Committee since late last year.
One name that has been in the mix for some time is that of the first woman in Europe to graduate with an engineering degree – Alice Perry.
Ms Perry, who was from Wellpark, graduated from Queen’s College Galway (now University of Galway) in 1906. The university’s engineering building is named in her honour.
The bridge was built by Jons Civil Engineering firm in County Meath and was assembled off-site before being transported to Galway. Funding for the project was provided in full by the National Transport Authority and the European Regional Development Fund.
(Photo: Sheila Gallagher captured the city’s new pedestrian footbridge being raised on the south side of the Salmon Weir Bridge in December. It will officially open next Friday, May 26).
CITY TRIBUNE
Minister branded ‘a disgrace’ for reversing land rezoning in Galway City
From the Galway City Tribune – Minister of State for Local Government and Planning, Kieran O’Donnell was labelled a “disgrace” for overturning councillors’ decisions to rezone land in the new City Development Plan.
Minister O’Donnell (pictured) confirmed in a letter to Council Chief Executive Brendan McGrath last week that he was reversing 25 material alternations made by councillors to the CDP 2023-29. He made the decision on the advice of Office of Planning Regulator (OPR).
Minister O’Donnell directed that 14 land parcels that were subject to land-use zoning changes by councillors as part of the Material Alterations to the Draft CDP should be reversed.
He directed that a further 11 land parcels in the city should become “unzoned”.
The Minister found that the CDP had not been made in a manner consistent with recommendations of the OPR, which required specific changes to the plan to ensure consistency with the national planning laws and guidelines.
At last week’s Council meeting Cllr Eddie Hoare (FG) asked for clarity on the process by which councillors could rezone the lands that had been changed by the Minister’s direction.
Cllr Declan McDonnell said, “What he [Minister O’Donnell] has done is an absolute disgrace”.
And he asked: “Do we have to have another development plan meeting to deal with it?”
Both Cllrs Hoare and McDonnell wondered what would become of the lands that were rezoned or unzoned by the ministerial direction.
Mr McGrath said the Council had put forward an argument in favour of retaining the material alterations in the plan, but ultimately the Minister sided with OPR.
He said if councillors want to make alterations to the new plan, they could go through the process of making a material alteration but this was lengthy.
The Save Roscam Peninsula campaign welcomed the Minister’s decision.
In a statement to the Galway City Tribune, it said the direction would mean the Roscam village area on the Roscam Peninsula will be unzoned and a number of land parcels would revert back to agriculture/high amenity.
A spokesperson for the campaign said: “the material alterations made by city councillors following lobbying by developers continued the long-standing practice of councillors facilitating a developer-led plan rather than an evidence- and policy-based plan that meets the needs of the city.
“The Minister’s direction is an important step in restoring confidence in the planning system. It is clear from the City Council’s own evidence on future housing projections that there was no requirement to zone these lands for residential purposes in order to meet the needs of the targeted population increase up to 2029,” the spokesperson added.